Aerial view of a four-person rowing boat moving in sync across dark blue water
OKRs Leadership Product Strategy

Navigating OKRs in Large-Scale Product Organisations

What a vertical of 20+ product teams taught me about OKRs, and where I would start today

Ody Bozhenko

Ody Bozhenko

27 Oct 2026 · 11 min read Published

Photo by Parsa Mahmoudi on Unsplash

My first OKR quarter inside a large product organisation, I waited for an email.

It wasn’t my first time with OKRs. I’d run them plenty of times, but always at the scale of one to three teams: one roadmap, one set of objectives, a director you could catch at the coffee machine. Then in 2024 my product became part of Schibsted’s marketplace organisation, today Vend. We adopted its way of working, and OKRs suddenly had to hold at three levels at once: the team, the vertical and the space between teams. Our team’s key results now had to line up with the vertical’s objectives.

So I assumed OKRs worked the obvious way. Somewhere above me, a Head of Product, a Product Director or a strategy group would decide what mattered this quarter and send it down. My team would take its slice and execute.

The email never came. A workshop invitation did.

The company had around 100 product teams across several countries. My own vertical had more than 20 of them, spread over three to five main products, with engineers, designers, GTM teams and stakeholders in different cities and different time zones of opinion. Driving a product with three teams and driving one with twenty are not the same job at a bigger size. With three teams, alignment is a conversation. With twenty, alignment is a system. If nobody designs that system, you get one anyway: the dependency spreadsheet, the escalation meeting, and the quarter that ends before half the teams have agreed what they’re doing.

This blog started with AI and Augmented Product Management, and that isn’t going away. But most of the job is still the classic stuff, and OKRs are where I’ve watched experienced PMs struggle the most once the org chart gets big. Me included.

Three teams align in a conversation; twenty need a systemOn the left, one Head of Product connected to three teams. On the right, company and vertical objectives above three products, each holding seven teams, with dashed dependency lines running between the products.1 to 3 teams20+ teams across 3 to 5 productsHead of ProductTeam ATeam BTeam CAlignment is a conversationCompany and vertical objectivesProduct AProduct BProduct CAlignment is a system. Dashed lines: dependencies
With three teams, one Head of Product holds the picture. With twenty, the dependencies between products are what OKRs have to manage.

Waiting for orders that never came

It took me a few internal workshops to unlearn the instinct.

OKRs, done properly, are not orders. Leadership sets the direction: the strategy and a small number of objectives for the company and the vertical. Usually no more than two or three, and one of them is the must-win battle, the objective every team in the vertical has to care about. The team then works out which outcomes it can actually move, writes key results it can influence and measure, and connects them back up. Then comes the part nobody warns you about. You go sideways, to every team whose work you depend on and every team that depends on yours, and you make sure the numbers fit together.

What surprised me most was the split. Leadership shared the objectives top-down, but the key results were ours to find. In most teams I’d worked with, the PM shares the objective and the key results, and everyone else is expected to deliver. In an OKR mindset, finding the right key results is a team effort. Engineers bring the technical insight, commercial people bring the market, and together you work out how you’ll actually measure the objective.

That was exciting. It was also time-consuming, and not always easy, especially for engineers. The workshops surfaced overlap too. Several teams often contributed to the same objective, which is natural, but it meant drawing clear lines between areas of responsibility and agreeing on key results that each belonged to one team. The process could be frustrating. Run properly, though, it got the whole team aligned on what we were building and why we were building it at all.

That shift, from receiving goals to proposing them, is the whole point of the method. It’s also why OKRs feel so uncomfortable inside big organisations, which were mostly built to pass instructions down. To see why the discomfort is by design, it helps to know where OKRs came from.

A short history: from Drucker to a ping-pong table

Peter Drucker described management by objectives in The Practice of Management in 1954. In practice MBO became an annual, top-down ritual, tied to appraisals and filed in a drawer.

At Intel in the 1970s, Andy Grove kept the objectives and added the missing half: a few key results per objective, measurable and reviewed every quarter. He wrote the system up in High Output Management in 1983, along with the best test for a key result I know:

“The key result has to be measurable. But at the end you can look, and without any arguments: Did I do that or did I not do it? Yes? No? Simple. No judgments in it.”

Andy Grove, Intel

John Doerr learned OKRs from Grove at Intel. In 1999 he pitched them to Google’s founders, when the company had 30 to 40 people and a ping-pong table for a boardroom. Google kept the method all the way past 100,000 employees, and Doerr’s Measure What Matters (2018) made it mainstream.

Here’s the irony. OKRs were born to escape top-down MBO, with short cycles and goals set close to the work. Yet most large organisations implement them by cascading objectives from the top until each team gets a goal it had no say in. That’s MBO with a new acronym.

OKRs took 45 years to travel from Drucker to GoogleTimeline from 1950 to 2020. 1954, Drucker coins management by objectives. 1970s, Grove builds iMBOs at Intel. 1975, Doerr learns them from Grove. 1983, High Output Management. 1999, Doerr pitches OKRs to Google. 2018, Measure What Matters.19501960197019801990200020102020Drucker coins MBO1954Grove builds iMBOs at Intel1970sDoerr learns from Grove1975High Output Management1983Doerr pitches Google1999Measure What Matters2018
The idea took 45 years to get from Drucker's book to Google's ping-pong table, and another 19 to go mainstream.

The basics, in five minutes

If you’ve run OKRs before, skim this. If you’re about to run them for the first time in a big org, don’t.

An Objective is what you want to achieve. Doerr defines it as “what is to be achieved, no more and no less.” It’s qualitative, it should make the team want to show up, and it lives for a set period, usually a quarter. One to three per team is plenty. Wodtke argues for one.

Key Results say how you’ll know you got there. In Doerr’s words, they “benchmark and monitor how we get to the objective.” Three per objective is the common pattern. Google’s internal guide puts the bar plainly: “It must be possible to objectively assign a grade at the end of the quarter.”

The hard part is that a key result should measure a change in what people do, not a list of things you’ll ship. Jeff Gothelf puts it as user behaviour that shows you’ve delivered value. Here’s the difference using examples close to a marketplace platform (illustrative, not real numbers):

Weak key result (output)Stronger key result (outcome)
Launch the new dealer onboarding flowCut median time from signup to first published listing from 9 days to 4
Ship three new DMS integrationsRaise the share of dealers syncing stock automatically from 40% to 55%
Run a pricing campaign in Q3Grow paid listings per active dealer from 12 to 15
Run 10 user interviewsNot a key result. It’s how you’ll find out which KR to chase

The launch still happens. It just moves to where it belongs: the plan for hitting the key result, owned by the team, changeable if the data says so.

Two more basics that matter enormously at scale:

Committed vs aspirational. Google separates the two. Committed OKRs are expected to land at 1.0, and a miss needs an explanation. Aspirational OKRs average around 0.7, with high variance. Christina Wodtke’s version is simpler: set each key result at a number you’re about 50% confident you can hit. If your org grades everything as committed, people stop stretching. If it grades everything as aspirational, nobody can rely on anyone.

OKRs are not performance reviews. The moment a key result decides someone’s bonus, it gets sandbagged. Every serious source agrees on this, and almost every large company is tempted to break it.

How it’s supposed to work with 20 teams

In a small company, OKRs are one sheet. In a big one there are at least three layers: the company, the vertical or product area, and the team. The instinct, mine included, is to connect those layers by cascading. Leadership writes objectives, each layer below breaks them into smaller ones, and the team at the bottom receives its slice.

Marty Cagan’s view of this is blunt. OKRs are “first and foremost an empowerment technique,” and “you can’t take your old organization based on feature teams, roadmaps and passive managers, then overlay a technique from a radically different culture, and expect that will work.” Allan Kelly adds the practical problem. Every layer of cascade is a wait, so with four layers the quarter is weeks old before the last team knows its goal. Worse, cascaded key results chain together: if one team misses, the layer above misses too.

The alternative is alignment, and it’s what my workshops were really teaching. It runs roughly like this:

  1. Leadership publishes the direction. Strategy first, then two or three objectives for the company and the vertical. Not key results for the teams.
  2. Teams draft in parallel. Each team looks at the vertical objectives and asks which outcome it can move. It proposes its own objective and key results, written with its engineers and designer, not handed to them.
  3. Teams align sideways. This is the step small companies never need. Google’s guide is explicit: a cross-team OKR should list every group that must materially participate, and each group’s contribution should appear in that group’s own OKRs. If your KR needs another team’s work and it isn’t in their OKRs, you don’t have a dependency. You have a hope.
  4. The Head of Product challenges, not approves. The review asks three questions. Does this connect to the vertical objective? Is it an outcome? Is it ambitious enough, or sandbagged?
  5. The quarter runs on a short loop. Wodtke’s rhythm works at any scale: a quick weekly check on confidence per key result, so the slide from 7/10 to 3/10 is visible in week four, not at the quarterly review.
  6. Grade honestly, then feed the next quarter. A 0.4 with a clear lesson is worth more than a 1.0 on a goal nobody needed.
Cascade passes goals down; alignment builds them up and acrossLeft, a cascade: company objectives feed vertical objectives, which split into slices for teams A, B and C, with arrows pointing down only. Right, alignment: strategy and direction flow down to a Head of Product challenge, team proposals flow up into it, and dashed lines between teams mark shared key results agreed sideways.CascadeAlignmentCompany objectivesVertical objectivesSlice ASlice BSlice CGoals arrive one layer at a time, andone team's miss breaks the layer abovedirectionproposalsStrategy and directionHead of Product challengeTeam ATeam BTeam CDashed lines: shared KRs agreed sidewaysTeams propose, align, then commit
In a cascade every layer waits on the one above. In alignment, direction goes down, proposals come up, and dependencies are agreed sideways.

Reporting, in practice. At scale you report in two directions. To the other teams, a shared key result should look identical in both teams’ OKRs, with one named owner. To the Head of Product, a good update fits on a slide: confidence per KR, what changed since last time, what you need from someone else. Anything longer turns into status theatre, and twenty teams of status theatre is a full-time job for somebody.

Direction flows down. Commitments flow up. Dependencies flow sideways.

Where it breaks: insights from the trenches

Here’s where my experience diverges from the books. Not because the books are wrong, but because they mostly describe the system working.

The roadmap in an OKR costume. The most common failure I saw. A team writes its roadmap, then wraps each epic in a key result: “Launch X by week 8.” Gothelf calls this rebranding the existing goal-setting process as OKRs without changing anything. You can spot it in seconds. If every KR starts with a verb like launch, ship, build or deliver, it’s a plan, not a result.

We made this mistake too. One of our key results read “Finish the migration by the end of the year.” That’s a deadline, not an outcome. After working through it, we shifted to what the migration was for: reach 90% adoption of the new platform, and keep customer churn below 3%.

The dependency key result. With 20 teams, plenty of good outcomes need two or three teams to move together. The KR sits in one team’s OKRs, the work sits in three backlogs, and by week six two of those teams have different priorities. At my scale, the real alignment work wasn’t writing objectives. It was the sideways conversations in the two weeks before the quarter started.

For us, cross-team key results were one of the hardest parts. They always produced some tension between teams. But there was no way around it: we couldn’t work in isolation, so alignment became a goal in itself. The overlap had an upside, too. Shared key results forced us to talk about the real objective, the blockers and the constraints we could only solve together. When a product launch was on the roadmap, we sometimes ran a dependency board where every obstacle was visible to every team. Once a blocker is on the wall, it tends to get tackled.

The quarter that’s half planning. Draft, review, rework, align, re-review. In a large org this can easily eat several weeks of a thirteen-week quarter. Teams end up executing for a few weeks, then planning again. If your OKR process feels like it never stops, it’s because it doesn’t.

OKRs without a strategy. Ravi Mehta’s point is the one I’d tattoo on every leadership offsite: “Goals are at the bottom of the stack, not at the top, because goals should come from the roadmap, not the other way around.” When there’s no clear product strategy, teams fill the vacuum with metrics they can move, and twenty teams each optimise their own number. The OKRs look fine. The product doesn’t go anywhere.

Sandbagging and the 1.0 culture. Google lists sandbagging, business-as-usual OKRs and timid aspirational goals among its classic mistakes. In big organisations they share one cause: hitting 1.0 looks good in a review. Once that’s true, everything becomes committed, and the stretch disappears from the system.

Consensus, the Nordic double edge. In Norway, a decision isn’t real until the people it affects have bought in. That makes the alignment step slower than in a top-down culture. It also makes it stickier, because a team that argued its way to a key result actually owns it.

That matched what I saw at Vend. Consensus sometimes slowed our decisions down, but once it settled, teams and leaders were far more aligned than any top-down memo could have made them. The risk runs the other way. Consensus can sand the edges off ambition, until an aspirational goal quietly becomes a committed one that nobody objected to.

It’s worth knowing that even the poster children struggle. Spotify famously put an “RIP OKR” slide in its planning presentations, switched to company bets built with its DIBB model (data, insight, belief, bet), and later reintroduced OKRs alongside it. The lesson I take from that isn’t about which framework wins. It’s that the rhythm of setting direction, committing and checking in matters more than the template.

Common pitfalls in large product organisations regarding OKRs:

  • They cascade goals down instead of aligning proposals up and dependencies sideways
  • They accept outputs as key results because outputs are easier to track
  • They tie grades to performance, which kills ambition in one quarter
  • They run OKRs without a visible strategy, so every team optimises its own number

Where to start on Monday morning

Read the strategy before you write a key result. Find the company and vertical objectives, and the strategy behind them. If you can’t find a strategy, that’s your first conversation with your Head of Product, not your last. Every good team OKR I wrote started from a sentence in someone else’s strategy doc.

Write the key results with your team, as a change in behaviour. Book one session with your engineering lead and designer. For every candidate KR, force the format “from X to Y” and ask what users will do differently. If a KR starts with “launch,” move it to the plan.

Walk the dependency map before the quarter starts. For every key result that needs another team, go and see that team. Either your need ends up in their OKRs, with the same wording, or you cut the KR. Then set up a fifteen-minute weekly confidence check, so problems surface in week four instead of week twelve.


More on classic product management and AI in the articles ahead. If you run OKRs differently at scale, reach out.

Nobody is coming to hand you your key results. In a big organisation, that’s the feature, not the bug.

Further reading

Books

  • Measure What Matters, John Doerr, 2018. The book that made OKRs mainstream, full of case studies from Google, Intel and the Gates Foundation. Read it for the why, not the process.
  • High Output Management, Andy Grove, 1983. Where OKRs were first written down, as one tool inside a whole philosophy of managerial output. Still the best management book most PMs haven’t read.
  • Radical Focus, Christina Wodtke, 2nd edition 2021. A short novel plus a practical system: one objective, three KRs, Monday commitments and Friday wins. The most usable OKR book for a single team.
  • Empowered, Marty Cagan, 2020. Not an OKR book, but the clearest explanation of why OKRs only work with empowered teams. The chapter on team objectives is the antidote to cascading.
  • Who Does What By How Much?, Jeff Gothelf and Josh Seiden, 2024. A practical guide to writing outcome-based key results that measure customer behaviour.
  • Objectives and Key Results, Paul R. Niven and Ben Lamorte, 2016. The most process-heavy of the bunch, and the one to read if you’re the person rolling OKRs out across a large organisation.

Articles

Odyslav Bozhenko

Odyslav Bozhenko

Senior Product Manager at Vend Marketplaces, Mobility Pro. Writing about discovery, strategy, and the craft of shipping great products.

Learn more →